Skip to content

Case study

Preliminary and Final Design of Casablanca - Settat - Marrakesh Motorway

Project
Preliminary and Final Design of Casablanca – Settat – Marrakesh Motorway
Client
Direction des Routes et de la Circulation Routière
Associated Firm
In Association with Transroute
Location
Morocco
Type
Engineering
Sectors
Transportation & Highway
Date
1993 – 2001
Project Details

Description of Actual Services Provided:

The alignment definition was completed for the entire length of Casablanca – Marrakesh 188Km.

Preliminary design for Casablanca – Settat section was completed in 1994 – detailed design of this section is in progress.