Skip to content

Case study

Supervision of Installation of Traffic Control Systems and Guard Rails on Bahsas - Mina and Jiyeh - Zahrani Motorways

Project
Supervision of Installation of Traffic Control Systems and Guard Rails on Bahsas – Mina and Jiyeh – Zahrani Motorways
Client
Conseil Executif des Grands Projets (CEGP)
Associated Firm
Location
Lebanon
Type
Engineering
Sectors
Transportation & Highway
Date
1998 – 2001
Project Details

Narrative Description of Project:
The works included installing signing, marking and safety equipment on parts of motorway network in North and South Lebanon, with a total value of USD 2.2 m.

Description of Actual Services Provided:
The objective of this contract is to supervise the contractors executing the installation of traffic control signs and safety equipment on part of the North Motorway, Bahsas – Mina Section and Part of the South Motorway (Jiyeh – Zahrani, except within Saida).

The responsibilities include:
– Coordination among all contractors
– Schedule control
– Checking shop drawings
– Checking location of sign installation
– Overall project control
– Approval of materials submittals
– Propose solutions for technical difficulties that might arise
– Assist the CEGP in the reception of works.